Most single-suction-point basement and slab installs finish in one working day. Tri-levels, walkouts needing two suction points, and crawl space membrane jobs can take two. The verification retest then runs at least 48 hours.
More detail
The sequence has three parts and the install day is only the middle one. Before it comes the assessment: foundation walk-through, a look at the sump and any rough-in, and diagnostics where the sub-slab material is unknown, which is what makes the quote fixed rather than hopeful. After the install comes verification, a measurement started once the system has run long enough to stabilize, placed where the original test sat so the before and after actually compare. If a closing date is driving the schedule, say so in the first call; the whole chain, assessment to verified result, fits inside most inspection periods when it starts promptly. Weather rarely moves the install itself but can shift a retest, since storm fronts and chinook winds are noted on any honest measurement report. See closing date crunch.