FAQ

Our closing is three weeks out and the test came back high. Is there time?

Direct answer

Usually, yes. Assessment and a written quote can happen within days, most installs take one day, and a 48-hour verification test follows. Three weeks is comfortable; ten days is tight but workable when everyone moves promptly.

More detail

Work the calendar backward. Closing minus a few days is when the verification result needs to exist on paper. Verification takes 48 hours plus scheduling, the install takes one to two days, and the quote requires an assessment visit, so the real constraint is how fast the objection deadline conversation produces a signed go-ahead. The step that burns deals is not the work, it is the week two sides spend arguing before authorizing it. Bring the contract dates to the first phone call and the schedule gets built around them, including which side the invoice goes to. One more transactional detail: make sure whoever is under contract understands the system conveys with the house, warranty paperwork included, so the closing file should hold the quote, license number, and retest result. The real estate radon page lays out the sequence.

Authoritative sources

Ready to get started?

About half of Fort Collins homes test at or above the EPA action level, and Larimer County averages six times the national figure. Mon-Sat 8am-6pm.

Call (970) 426-0858Text us

Prefer to text? Open your texting app